2 x ENEDIS from 2 separate 20 kV networks (SNCF + city).
Dual TGBT circuits for crossing at the level of the distribution boards and the racks.
Human risk tolerance.
2 inverters connected in //.
Automatic bypass automatic tilting calculation for micro-cuts.
Insulation transformer (galvanic) harmonic isolation of neighbors.
2 stand-alone inputs per bay autonomous per rack
100% green energyGEG)
Secondary
If the public supply network is cut off, the supply is taken over by the battery banks (15 minutes of autonomy at full charge), then by the power generator (immediate start) in less than 30 seconds.